15-May-2024 11:30:00 AM |
01-May-2024 05:12:03 PM |
01-May-2024 05:12:03 PM |
(1) SET OF GAUGES FOR CHECKING SCREW COUPLING OF LOCOMOTIVE AS PER ANNEXURE WITH CALLIBRATION CERTIFICATE
(2) DIGITAL OUTSIDE MICROMETER RANGE : 225-250MM LC 0.001MM MAKE-PRECISION GERMANY OR SIMILAR WITH CALIBRATION CERTIFICATE NABL APPROVED
(3) DIGITAL OUTSIDE MICROMETER RANGE : 250-275 MM LC 0.001MM MAKE-PRECISION GERMANY OR SIMILAR WITH CALIBRATION CERTIFICATE NABL APPROVED/40245171/106333730 |
Ministry of Railways |
N/A |
|
N/A |
15-May-2024 11:30:00 AM |
01-May-2024 05:38:14 PM |
01-May-2024 05:38:14 PM |
(1) SET OF GAUGES FOR CHECKING SCREW COUPLING OF LOCOMOTIVE AS PER ANNEXURE WITH CALLIBRATION CERTIFICATE
(2) DIGITAL OUTSIDE MICROMETER RANGE : 225-250MM LC 0.001MM MAKE-PRECISION GERMANY OR SIMILAR WITH CALIBRATION CERTIFICATE NABL APPROVED
(3) DIGITAL OUTSIDE MICROMETER RANGE : 250-275 MM LC 0.001MM MAKE-PRECISION GERMANY OR SIMILAR WITH CALIBRATION CERTIFICATE NABL APPROVED/40245171A/106333826 |
Ministry of Railways |
N/A |
|
N/A |
15-May-2024 11:00:00 AM |
18-April-2024 06:31:30 PM |
18-April-2024 06:31:30 PM |
(1) SW-I : Electrical arrangements to Provision of Drinking water facility at Goods loading / un-loading area of SMLI, YTG and RNJP railway stations. (2) SW-II : Electrical arrangements to Provision of New Station building at Mariyammanahalli (MMI). (3) SW-III : Raising and extension of platform PF 1 to make it to High level of 560 M length with cement concrete flooring at Hagaribommanahalli (HBI) station. (4) SW-IV : Electrical arrangements to Improvements to platform surfaces at KGX, RLP, K/E-02-2024-25SL02/74666545 |
Ministry of Railways |
N/A |
|
N/A |
06-May-2024 03:30:00 PM |
11-April-2024 12:11:00 PM |
11-April-2024 12:11:00 PM |
(1) Various type of improvement works at RUBs/LHSs in Rewari-Bassi section.
(2) DEN (East) Section -Provision of hiring 32HP Mud Pump and Mud Pump operators (for 2 years i.e. 2024 and 2025)./ENGG-JP-2024-25-11/74552651 |
Ministry of Railways |
N/A |
|
N/A |
15-May-2024 02:25:00 PM |
25-April-2024 03:36:40 PM |
25-April-2024 03:36:40 PM |
(1). EQUAL ELBOW 15 MM BORE.
(2). EQUAL ELBOW 15 MM BORE./35245023/106328502 |
Ministry of Railways |
N/A |
|
N/A |
05-June-2024 11:30:00 AM |
18-April-2024 05:26:34 PM |
18-April-2024 05:26:34 PM |
(1)All Silicon Foleys Catheter 2-Way Uncoated Size - 16FR (2)All Silicon Foleys Catheter 2-Way Size -16Fr Like BARD/BLUENEEM(3)All Silicon Foleys Catheter 2-Way Size -14Fr Like BARD/BLUENEEM/82243099/106322179 |
Ministry of Railways |
N/A |
|
N/A |
03-May-2024 03:00:00 PM |
03-April-2024 03:52:14 PM |
03-April-2024 03:52:14 PM |
(1)Bhusawal;- Repairs to drinking water supply arrangement including purification plants / tanks at Bhusawal. (ZBB-2023-24) (2)Bhusawal:- Augmentation of Filter plant from existing 12 MLD to 20 MLD by increasing capacity of Areation fountain, flash mixture and venture flume in Water filter plant Bhusawal. (3)Bhusawal:- Improvement of carriage water and colony water supply by upgrading and enhancing the water treatment process at Bhusawal.(4)Bhusawal:- Heavy repairs to old damaged pipe line/DRMWBSL142024t1/74465231 |
Ministry of Railways |
N/A |
|
N/A |
08-May-2024 03:00:00 PM |
10-April-2024 12:09:20 PM |
10-April-2024 12:09:20 PM |
(1)Construction of the proposed Road Over Bridge(ROB) of span (1 x 36 Mtr. Composite Girder + 1 x 24 Mtr Composite Girder) at Railway Km. 462/13-15 in lieu of LC No.203 between KUR-KXPR stations. and (2) Construction of the proposed Road Over Bridge(ROB) of span (1 x 54 Mtr Bow String steel Girder) at Railway Km. 489/9-11 in lieu of LC No.225 between BSDP-KAPG stations on KUR-PSA main line of Khurda Road Division./e-Tender-SPL-KUR-04-2024/74544435 |
Ministry of Railways |
N/A |
|
N/A |
28-May-2024 11:30:00 AM |
24-April-2024 10:42:24 AM |
24-April-2024 10:42:24 AM |
(1)Deflazacort 30mg, Tab./Cap.(2)Triamcinolone 40mg. Inj. 1ml. Vial(3)Methylprednisolone 8mg. Tab./Cap./82242393/106326696 |
Ministry of Railways |
N/A |
|
N/A |
07-May-2024 11:00:00 AM |
15-April-2024 11:21:54 AM |
15-April-2024 11:21:54 AM |
(1)Diversion and Shifting Of S&T gears in connection with Revised yard arrangements showing pro. connection of track between KSN-DKC BG Line and Exg. Common Loop line in Krishna Yard.(2) Alteration of E.I work involves in connection with track between KSN-DKC BG Line and Exg. Common Loop line in Krishna Yard/G-SG-CN-KSN-DKC-8-2024/74050658 |
Ministry of Railways |
N/A |
|
N/A |